Shown below are 2 pictures I took today of work progress. The end wall picture is of the East facing end which will accommodate the large hangar door (16' x 32'). The walls are a taupe (rawhide) color and the roof and all trim is a barn red color. The wall sheeting on the bottom 4 feet of the wall will be bricked in after the concrete footer is completed.
The distant picture below shows the South facing wall with insulation in place waiting for the taupe colored metal sheeting to be installed. This wall will accommodate 2 large garage doors (12 feet high) as well as 2 walk-through doors. Under the porch I will have an outdoor kitchen area installed. It will include a grill, sink as well as counter area for food preparation. The columns will be bricked to match the lower section of the main wall.

3 comments:
Holy COW that place is coming along fast! I hope your almost ready to move in by Thanksgiving so I can see the finished/nearly finished product! Maybe by Christmas?
I hope your ready by thanksgiving too. That way bignate can help move all the safes and cars!! Ha ha. I think i'm feeling a cold coming on in a couple months :) ha ha.
Looks like the building is coming up fast. I look forward to seeing it next time I head through Sparta.
Post a Comment